Page 13 - Arrow Shark X-30 Owner Manual
P. 13
A: This stainless steel gasket installs at center hole of the X-Cooler base against the flat flange on the
steel header.
B: This silicone O-ring installs behind the header flange to prevent water leaking into the exhaust
header.
C: This green fluorine O-ring installs behind the silicone O-ring to prevent the water leaking out from
the center hole of the cover.
D: This O-ring installs in the groove of the X-Cooler cover against the main block to prevent the water
leaking from join area.
13