Page 15 - Arrow Shark Ultra-Jet Owner Manual
P. 15
F: Apply some sealant around the bottom and the edge of G: Apply some sealant at bottom of the intake main body
the intake grate, and match the installation holes to the where joints with the intake grate, then, match them
holes on the bottom of the hull, stick them together. together, make sure the seal is tight for no water leaking in.
H: Secure the stainless steel hull bottom adaptor along I: In sequence install impeller housing, drive shaft &
with the intake grate and intake body from bottom of the impeller, stator blade & stator bowl assembly onto the
hull with supplied bolts. transom, and tighten all bolts with loctite applied.
K: Install the steering and reverse control servos
J: Install remaining components onto Ultra-Jet to finish
the transom part installation. from inside of the hull, and connect to either gas
engine or electric motor power to finish the
Ultra-Jet power part installation.
15