Page 4 - Arrow Shark E-Starer V4 Owner Manual
P. 4

Clutch Box Assembly
























































































    1: Lower half clutch box installation: apply some grease around the bearings and also apply some Loctite inside the
    thread holes. Place the springs onto the bolts and pawls as pictured above.
    2: Screw a bolt into the clutch box thread hole, but do not tighten - make sure the pawl can move up and down freely
    by its spring
    3: Repeat the same installation on the other three pawls and springs to complete the lower half clutch box.
    4: Upper half clutch box installation: insert the lower plum coupling part via the upper clutch box center bearing hole.

                                                            4
   1   2   3   4   5   6   7   8   9